NTPC Unchahar Creates National Record

96036.jpg

NTPC Unchahar has set a National Record with 686 days of continuous generation by its 210 MW Unit-I surpassing APL Mundra achievement. Unchahar is located at Rae Bareli district of Uttar Pradesh with an installed capacity of 1060 MW which includes 10 MW Solar.


NTPC Installs 110 KWp AC Microgrid at NETRA

96037.jpg

An AC Microgrid test bed of 110 KWp Solar PV with demand side management to cater three phase critical loads has been installed and commissioned at NTPC Energy Technology Research Alliance (NETRA), the R&D arm of NTPC Ltd, Greater Noida. System architecture and centralized control has been designed in-house to monitor and control all generating sources, storage and loads.


Премиальная новость ?

Oil & Gas
selected by
energybase
Импортозамещение в действии: оборудование для первого российского манифольда будет представлено на ПМГФ 2019

АО «ПТПА» впервые представит на выставке арматуру для подводной добычи на шельфе, полностью разработанную и изготовленную в РФ.

  • Совместный проект ПАО «Газпром» и российских производителей, в числе которых АО «ПТПА», является примером успешной реализации программы импортозамещения.
  • АО «ПТПА» — ведущий российский производитель трубопроводной арматуры впервые представит технологически сложное оборудование для подводного газового добычного комплекса, полностью спроектированное и изготовленное в России.
  • Подводная арматура АО «ПТПА» вошла в состав опытного образца манифольда, который был изготовлен по заказу Министерства промышленности и торговли.


News 1-2 of 2.